GM doing these videos is good, but a bit cheesy too... Factory Zero is planned to have 1900 Employees by the end of 2022, when was the last time that plant had that number of employees? Hamtramck had previously been running at idle speed for so long, nice to see GM speeding it up.
 

·
Registered
2019, Chevy, Volt, Voltech with 7.2 kW optional Charger
Joined
·
771 Posts
"This res actually comes from our Brownstown facility... but by the end of this calendar year we'll be building these packs here at Factory Zero."

That's a very interesting line to me.
 

·
Registered
Joined
·
3,022 Posts
Discussion Starter · #3 ·
"This res actually comes from our Brownstown facility... but by the end of this calendar year we'll be building these packs here at Factory Zero."

That's a very interesting line to me.
Yes, the automated battery assembly shop at Hamtramck is almost complete, it's on the same schedule as expected battery cell ramp from Lordstown. I think August is official SOP at Lordstown, so by September-October we should see significant increase in production for both HummerEV and LYRIQ.

Lordstown is already running trials of some operations, and working on increased quality and yield. The chemical processing at Lordstown will start ops in July.
 